Totally exciting. I also have a bit more detail on the forthcoming timeline and, for once, it’s beginning to look a bit better than before:
- April 19th – ex-factory / exchange
- April 23rd – launch / commissioning
- April 30th – hand over to CatCo
- May 4th – hand over to Reliance captain
- May 6th/7th – possible departure from France
The trip to the BVIs is expected to take 30-35 days during which time we’ll be able to track her location. Before then I’ll look for a way to publish her position on this website.
Leave a Reply