Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the atahualpa domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/aboarddi/public_html/blog/wp-includes/functions.php on line 6131
Countries « Aboard Dignity (Lagoon 420) Blog

Categories

A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

Finally done

In a blizzard of last day activity we’re finally ready to go. Final projects :

  • Raised dinghy
  • Attached sails – they look nice
  • Attached rudders
  • Assembled steering gear
  • Mailed letter to US / and camera case (TradeMe auction finally went through)
  • Paid everyone – arggh.
  • Installed extra handrails on scoops.  This was not on the project list but Helen decided I had some spare time before we splashed.
  • Dropped car off in town – thanks to John on Sea Mist

As I speak the tractor is attaching itself to us and in a short few moments we’ll be off.

There are a few more pics in this morning’s album

4th Thursday on the hard

I hope this is our last full day ‘status’ report of life on the hard. There’s an expression : “Life is hard in the yard.” It’s true.

  • Wrote a launch checklist.  Having played around with the underwater bits I want to be sure we catch any leaks as early as possible.
  • Tied on new jib sheet protector.  This is a line tied from a couple of meters up the mast down to the deck to keep the jib sheets away from the mast and being damaged.
  • Installed new clamshell scoops.
  • Visited the Town Basin Marina to confirm our intended Friday (that’s today !!!!) arrival and discuss location.  Bumped into Darusha/Steve from Scream and Christa from Lileth.
  • Tested the freezer.  Not exactly a hard task.  I simply turned it on.
  • Put sea anchor away.  Even though it needs another wash we’ve properly packed it in the bag and stowed it ready for unhoped for use.
  • Cleaned deck/dive locker.
  • Connected other end of exhaust hose (ie, the end not ultimately attached to the new through hull)
  • Helped install the new anchor guard
  • Tested the starboard motor.  In doing this we had one of those “Oh No” moments.  The zinc on the end of the prop was wobbling and so was the end of the on which it sat.  Was the nut (the one we’d had pinned onto the shaft) on wrong?  Was the shaft bent?  I took two and a half expert oppinions and the general sense was the prop was running withing a hairbreadth of true and we had no problem.  Phew.
  • Attached and raised anchor
  • Collected the new sails.  In doing this I discussed options with the sail makers for the fitting.  End result is they’re coming to the boat in the yard at 7:30am this morning.  I took the sails as there was a possibility the boat may already be raised by then making it more awkward to get them aboard.

In the afternoon both Helen and I were both awash with fatigue.  Perhaps it was coming down from the adrenalin of the wobbly nut.  After three weeks of dust and dirt and being a day from launch, the possibility of being delayed was not a pleasant one.  But we kept on and energy did eventually renew.

One other event which could have been a lot nastier than it ended up occurred when I was taking a hard drive over to Tahina.  I took a short cut under the some boats and was just about to jump a ditch when the firm footing for my take off turned out not to be firm at all.  I plunged into the ditch arresting my fall with my shin on some rocks.  There were scratches and numbness down my leg but no extra joints.  The hard drive and my bones were intact so all else was secondary and a relief.  Karen and Frank tended to my condition by preparing soapy swabs to clean the dirt out of the wounds and giving me a big band aid (which later took off a lot of hair) for the main bash.  I refrained from taking any further short cuts for the rest of the day.

The external work is now more or less complete. The anchor guard is now in place and the anchor chute epoxied. We’ve had bigger screws put into the mast based and have had propspeed applied to the props and shafts. Bar one small section on the starboard side the sides of the boat have been polished.

The main entertainment for the day came from the launch of a multi million dollar power cat which didn’t go as smoothly as it could.  The truck bringing it to the yard fractured in a few places and they had one big mistep (it appeared) when they placed it on the ramp above high tide.  While it was interesting to watch from time to time our main interest in seeing it launch was to know there was no bloody great boat stuck in the ramp we’re due to exit on Friday (today !!!!!).

Towards the end of the day I dropped of a case of beer for the workers as a thank you.  Turned out to be very welcome as Peter is taking them down the river this evening for a ‘booze cruise’ and this will add to the party.

We finished the evening by sharing grilled sausages and veg with Dennis and Allison from Kalida.  We had a good time together and the evening ended off with their sharing some of the Fiji experiences and our taking notes on places to go.

Soon.

Today, if you hadn’t guessed, is launch day. The sails will go on. The polishing complete. The dinghy raised. The boat raised and rudders fitted. This afternoon we’ll be off.

Oh.  How can I forget.  I uploaded pictures of the concert/wetlands walk from last Sunday (you’ll need to go back).  And I’ve uploaded some pictures of the boat work.  Here.

I have a few more pictures to add and take so I’ll republish this album when it’s complete.

3rd Wednesday on the hard

Sooner or later we’ll run out of things to do.  But not this day.  We ended up on a bit of a roll :

  • Hung up the sea anchor again to try and remove more of the dampness.  After another full day up the mast we came to the conclusion that it really needs a scrub.  The best place, we reckon, is in the sea either in NZ or Fiji.  I think we’ll repack it as is and clean it in Fijian waters.
  • Discussed remaining cleaning work with Peter.
  • Removed and cleaned clamshell scoop (and hull underneath) on nacelle.
  • Called dive shop to arrange pick up of serviced regulators next Monday.
  • Made arrangements for sail fitting.
  • Remove grease from serviced winches.  I came to the conclusion that I’d put too much grease on the 3 winches serviced so far.  Helen got the job of cleaning off the excess.
  • Wound up the financial side of our old Llc for the boat.
  • Completed the dinghy Inflation and tied on the cover.
  • As a result of the tech finishing the work on our prop shafts I was able to :
    • Completed the SSB ground plane on the port side
    • Replaced proper battery configuration on the starboard side (bar the last two batteries so we can inspect the shaft seal after we launch)
    • Installed all the new shaft zincs.
    • Tested port motor (starboard motor shaft was covered in polythene sheet at the time)
  • As a result of the painting being complete I was able to :
    • Installed new ground zinc
    • Glue the sea cock onto the new through hull fitting the exhaust hose in position so the glue sets with the valve orientated correctly.
  • Our chain chute was returned with an extra curve in it.  I performed the reinstallation.
  • Reorganized a lot of the boat interior returning many things to their proper places.
  • One run to the chandlers for a few bits and pieces.
  • One run to the supermarket for provisioning.
  • Spent a while on Alison’s / Dennis’ boat (can’t remember name) fixing their navigation software.

From the above you can see two of our paid for projects have been completed.  The shaft alignment  / shaft seal work was completed allowing me to complete the work dependent on that.  The bottom painting was also completed and all the plastic wrap removed from the boat.  The bottom looks nice.  The windows even better now that we can see them properly.  We really are pleased with the results of that project.  The chain chute and our anchor guard came back from the stainless steel folks.  The guard should go on today.

It’s all looking good.  We have time for the remaining work to be finished before we launch and the weather gods continue to cooperate at least until the weekend.  Then it looks like we’re going to have a few poor days which may delay our final sail fitting.  Very soon, though, we’ll have the unpleasant task of paying for all of the work we’ve had done.

We were quite exhausted by the end of the day but we still had enough energy to visit Karen and Frank on Tahina for the evening.  We shared some wine and played a couple of words games.  Helen and I had to peel off as we were getting somewhat sleepy.

It’s beginning to look like we’ll have four sets of visitors to the boat during the five to six months we’ll have in Fiji.  While this will take a bit of coordination we’re very excited about this.  One of the benefits of a catamaran is the ability to have guests aboard and not feel on top of each other – one of the reasons we went for a whole boat rather than half of one.  Not long now.

3rd Tuesday on the hard

With the work list dwindling you’d think we’d be having less to do.  It doesn’t seem to be working out that way :

  • I remove temporary batteries I hooked up sitting over the starboard shaft access ready for the techs planned visit.
  • I made my (hopefully) last trip up the mast to file down the epoxy I’d applied to the oversized countersunk holes.
  • The engine tech arrived and told us the second shaft seal was now not expected to arrive from overseas until late May and suggested we try and order one from the US.  I nearly tore his head off.  We then came up with the idea of using the new one and the best of the old ones which is still pretty good.
  • I cleaned and sanded the prop shafts one more time.
  • The engine tech ran into a new problem as the newly machined couplings had been machined in error and needed some more work.  Despite all this, all is expected to be complete on this front by Wednesday.
  • Replaced a bent clip on the dinghy hauling lines.
  • Inventoried genset oil to determine how much more to buy in.
  • Stored around 14 boxes of wine away from the world.
  • Laid out storm anchor.  This is one of those jobs we should have done a long time ago.  We’ve had a second hand para anchor and a brand new set of bridles/lines for nearly two years and we’ve never taken them out of the bags to inspect them, let alone test them at sea.  We removed both sets of lines from the bags and worked out how we would set them from the boat at sea.  We removed the parachute from it’s bag and found it intact but covered in mould.  We hoisted it up the mast for a couple of hours in the afternoon to dry out.  It will have to go up there again today.  Also spent ages trying to untangle the lines to the parachute.  It’s better but not complete.
  • Collected our finished windows.  I took them round to Leu Cat who are considering doing the same project.  They were quite impressed.  There I picked up our two clamshell scoops which had arrived from the US.  Back at the boat Helen was delighted.  We put them into the window frames and checked them out through the plastic still wrapping the boat.  They looked good but we really need to see them with the plastic off.
  • Bottom painting progressed.  Second primer followed by first coat of anti-foul went on.

During the day it was nice to meet John and Lucy from Tyee who’ve just returned from Canada.  Their boat has been in the yard while they’ve been home.  With envy we saw Emily Grace splash/launch.

In the evening it was a pleasure to eat out with Mike and Anne from Callisto at our preferred curry house in Whangarei.  Like us, they like their curries hot so we were able to share five dishes amongst the four of us.  Delicious.

The weather forecast for the rest of the week remains good and all signs point towards a Friday afternoon launch for us.  Today the second layer of anti-foul goes on as will a third application on all our leading edges.  The engine tech should have our prop shafts reconnected and we may even have the hull clean started.  A lot to do yet but it all looks doable.

3rd Monday on the hard

My blog titles have long since lost any originality.  Despite each day being quite different I think the titles capture the essence of our current existence so I’ll keep it up until the day we splash.

With no further ado, straight in with the days progress report :

  • I discussed our concerns with the new anchor chute with Peter.  The result was that Dan spent some time removing it (it was very firmly stuck to it’s epoxy base) so it can be taken to the engineers to be curved some more.
  • With Dan’s help we attached the new through hull for the genset water exhaust.
  • I obtained a couple of new screws for the headsail furler and ascended the mast to expoxy the holes and put in the new screws.  It looks like the original holes were misaligned by about a milimeter and someone countersunk the outside sleeve wider to accomodate the screws in the correct position.  This has left it with a certain amount of movement.  The epoxy should minimise this small movement.
  • Assembled the grab bag and double checked remaining items required.
  • I attempted to move our stern light behind the wind gen pole which obscures it from one angle.  Turned out there was no easy option which would also be elegant.  I ended up leaving it where it is and sealing the course of the power supply.  I’ll await more inspiration.
  • The varnishing of our shower door sill was completed.
  • I spent much of the afternoon working with the rigging guy fixing the unbalanced tine at the top of the forestay.  Turns out this work was more than prudent as the asymmetrical forces on the tine had resulted in the retaining split pin becoming close to being sheared.  A failure here would have resulted in the main pin working loose and the loss of the forestay and possibly the loss of the mast.  Not good.  We’re glad we did this.
  • I called the sign company regarding our windows.  They should be ready Tuesday afternoon.
  • I researched the means of purchasing duty free fuel up in Opua.  Given the probably May passage to Fiji it looks like we’ll have time to get back up to the Bay of Islands before then.

Alongside all the the painting has begun on the boat.  First, protective plastic wrap was taped to the boat above the point where the hulls will be painted and all the way up to the safety lines.  We’ve had our first coat of primer applied.  I discussed the pros/cons of applying a second coat of primer with Peter and have decided to go with a second coat.  This will make our subsequent bottom paints much simpler and cheaper.  We used our dinghy davits to raise our rudders into the air so they can be easily painted.

The weather forecast is looking good for the rest of the week so we should make plenty of progress with the bottom painting.  The mechanic is due back today to install the starboard shaft.  That will involve removing the temporary supplemental battery setup I have in place to allow him access.  Once he is complete I’ll be able to put most of the batteries back into their intended positions.  I’ll leave some access to the shaft to enable inspection and ‘burping’ of the shaft seal following our splash.